No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi |
---|---|---|---|---|
1 | CV. C 97 CONSULTANT | 02.548.001.3-805.000 | Rp. 271.700.000,00 | Rp. 271.700.000,00 |
2 | PT. INTENSIF KONSULTAN PEMBANGUNAN | 86.899.685.1-805.000 | Rp. 318.692.000,00 | Rp. 318.692.000,00 |
3 | CV. FAIS KARYA ENGINEERING CONSULTANT | 01.690.923.6-805.000 | ||
4 | CV. Annur Consultant | 02.885.288.7-801.000 | ||
5 | PT. ASIAH LINTAS RAYA | 75.342.682.4-801.000 | ||
6 | PT. AREZMAH MULTI KONSULTAN | 02.032.723.5-805.000 | ||
7 | CV. EMPAT SATU DUA UTAMA | 72.254.725.4-808.001 | ||
8 | PT. INOVASI KONSULINDO RAYA | 82.106.798.0-803.000 | ||
9 | PT.THAHIRANINDO Consultant | 01.971.736.2-804.000 | ||
10 | CV. MAHADAYA CIPTA | 02.872.311.2-808.000 | ||
11 | CV. ABYSEKA INDOCIPTA | 73.628.836.6-805.000 | ||
12 | CV.KINGSTOM TEKNITAMA | 02.535.020.8-822.000 | ||
13 | CV. MEGAH CIPTA DESAIN | 66.145.591.5-801.000 | ||
14 | CV. PANDAWA LIMA KONSULTAN | 74.837.638.1-808.000 | ||
15 | PT. ANGKASA GLOBAL CONSULTANT | 75.390.716.1-805.000 | ||
16 | CV. PUTRAINDO ENGINEERING | 71.521.320.3-804.000 | ||
17 | CV.DAYA KREASI DESIGN | 02.964.517.3-802.000 | ||
18 | CV. FAIZ ENGINEERING | 81.036.877.9-808.000 | ||
19 | CV. SAHARA ENGINEERING | 83.346.789.7-805.000 | ||
20 | PT. Gema Teknik Konsultan | 03.026.689.4-805.000 | ||
21 | PT. WIDYA SARANA CONSULTANT | 43.313.469.9-801.000 |