No Nama Peserta K SK SB B A T ST P PT HN H SH SA P PK Alasan
1 CV. AFKAIDA SARANA KONSULTAN - 72.254.725.4-808.001 100,0 100,0 65,45 Rp. 126.027.000,00
Rp. 126.027.000,00
Rp. 125.697.000,00 20,0 85,45
2 CV. MEUTHIA MULTI KONSULTAN - 03.051.559.7-801.000 95,0 95,0 60,4 Rp. 126.027.000,00
Rp. 126.027.000,00
Rp. 126.027.000,00 20,0 80,4
3 CV. MUTAHIR - 01.137.912.0-805.000
4 CV. DARMA ANUGERAH KONSULTAN - 02.811.634.1-801.000
5 CV.ANTARA GROWTH - 74.813.020.0-623.000
6 CV. PANDAWA LIMA KONSULTAN - 74.837.638.1-808.000 100,0 100,0
7 CV. MAKMUR SEJATI KONSULTAN - 80.488.889.9-805.000 71,0 71,0
8 PT. ARCANSIA DWITAMA KONSULTAN - 73.368.534.1-804.000 95,0 95,0
9 HS CONSULTANT - 02.821.174.6-805.000
10 CV. NURI INTI CONSULTANT - 75.193.535.4-805.000 71,0 71,0
11 CV. KARYA SEPAKAT CONSULTANT - 73.092.095.6-801.000 71,0 71,0
12 CV. ELRIGUAZ UTAMA - 01.753.982.6-812.000
13 PT. INOVASI KONSULINDO RAYA - 82.106.798.0-803.000
14 CV. C 97 CONSULTANT - 02.548.001.3-805.000
15 KALOLA RAYA KONSTRUKSI - 80.197.184.7-808.000
16 CV. DUA PILAR - 81.117.051.3-808.000
17 CV. ABYSEKA INDOCIPTA - 73.628.836.6-805.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak